Observe construction to ensure the contractor does the placing, finishing, and curing as specified. 1800 Washington Blvd., Baltimore, MD 21230, Stormwater, Dam Safety, and Flood Management Home, Plan Review for State and Federal Projects. rock slope protection (3/8 t, class vi, method b) (ton) 723060 rock slope protection (300 lb, class iv, method b) (cy) . The contract plans will designate the required rock layer thickness for each location. with a minimum of 50% of the stones . 1 0 obj Type R. Use stones between 50 and 250 lb. Woven Stabilization and Separation Geotextiles, - Dimensions & Weights for EcoTubes Geotextile Dewatering Tubes, - Dimensions & Weights for EnviroGrid Cellular Confinement, - Material Safety Data Sheet (MSDS) - Drainboard, - Material Safety Data Sheet (MSDS) - Stratagrid, - Material Safety Data Sheet (MSDS) - Envirogrid, - Product Advantages of EcoTubes Geotextile Dewatering Tube, - Product Benefits of EcoTubes Sludge Dewatering Tubes, - Product Benefits of US Fabrics' Foundation Drains, - Product Benefits of US Fabrics' Sheet Drains, Design/Installation Guidelines; Applications, - Comparing Old Style & New Style - Strata Geogrid, - French Drain Exterior Foundation Install, - Geogrid & Welded Wire Form Inside Corner Placement, - Installation Guideline for Separation Heavy Geotextile, - Installation Guideline for Separation Medium Geotextile, - Sheet Drain Exterior Foundation Install, - Theoretical Tube Volumes & Dewatering Capabilities, - Typical Cross Section - Vegetated Reinforced Soil Slope, - Equivalent Products for Composite Drains, - Volumes & Dewatering Capabilities for EcoTubes Geotextile Dewatering Tubes, - Geogrid Quality for Finished Product and Raw Materials, - Use Woven Geotextiles Instead of Geogrids, - Municipal Waste Water & Water Treatment w/ EcoTubes, - SRW (Segmental Retaining Wall) Drainage. << AASHTO is typical mass of 4.1 sy/oz. Chapter 4: Construction Details, Section 72: Slope Protection, Direction of flow and angle of impingement at various water stages, Capability of adjacent soil types to resist erosion from wash and eddy currents. 2005), although maintenance considerations may serve to reduce this maximum size. The contractor must also ensure the construction of adequate returns and keys at the ends. Thishandbook includes new and revised details for the various practices that are used in the development of erosion and sediment control plans. RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. Soil Stabilization Matting - Channel Application, Perm. Center splash basin . RSP-fabric Type of geotextile and quality requirements per Section 96 Rock Slope Protection Fabric of the Standard Specifications. endobj 0000005658 00000 n More simply put, if it is made of fabric and buried in the ground it is probably a geotextile! <> <> Consult engineer to ensure applicable design requirements are met. Review the plans for the location and number of weep holes. cIP=L ?L-o'OfE;9'WgIBdysw>vOo#g 8L3f*7Mnd*3cdLy&v~;6s8;)9Q"SE8a+3/>svm^}+7Ea8IG01nY5y7mxJ]X9sGjv][ppYdv r=0EVPTO(Xam -j9 WYY5:F"l9o&l:dyg^0GXoZgm[\H2#RrlXpZd`CAlwE.Sz.BuTiqT;E@m3I~`km&yeF Weight will vary based on density of rock available for the project. 0000005681 00000 n << Smooth the graded foundation. 6'' min. To ensure the success of Method A, ensure that the bearing of rocks from one to the other follows specifications and that the use of chinking rocks is limited to filling voids. If the rock layer is shown as 7 inches thick, comply with grading shown in the following table: If the rock layer is shown as 5 inches thick, comply with the grading shown in the following table: If the rock layer is shown as 4-inches thick, comply with grading shown in the following table: Granular material must contain at least 90 percent crushed particles when tested under California Test 205. When placing rocks, the contractor should ensure each placed rock is stable and not dependent on the one on top to hold it in place. Neoloy Tough-Cells in slopes prevent erosion, enable drainage and stabilize the slope to provide a green surface cover. 0000009682 00000 n Technical Support available for assistance. 0000002313 00000 n Lap 6'' min. The concrete slope protection method consists of paving the embankment with portland cement concrete. Otherwise, placement could result in what is known as rockers or unstable rocks. You may be trying to access this site from a secured browser on the server. The Difference Mirafi N-Series Nonwoven Geotextiles Make: The placement of a flexible, porous geotextile between dissimilar materials so that the integrity and intended functions of both materials remain intact or are improved. Links to important documents and pages can be found below the chart. concreted-rock slope protection (1/2 t, class vii, method b) (ton) 723215 concreted-rock slope protection (1/4 t, class v, method b) (cy) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) 729011 rock slope protection fabric (class 8) 729012 rock slope protection fabric (class 10) 750020 rigid rail fall protection system Rock Slope Protection Fabric, used in slope stabilization projects (see Technical Note on Rock Slope Protection / Rip Rap) When required by the Project Engineer, a Certificate of Compliance for each type of fabric being used should be issued by the supplier and furnished to the Engineer. The following common types of slope protection are covered in this section: Other protective devices are used in conjunction with highway construction, and when used, they are included in the contracts special provisions. 0000007029 00000 n Provide filter fabric in accordance with DMS-6200, Filter Fabric. For protection stone riprap, provide Type 2 filter fabric unless otherwise shown on the plans. Ensure that rocks of the specified sizes and shapes are being used. Products with a are available to meet BABA (Build America, Buy America) requirements. 3. If there are no prevailing agency specifications, it is recommended to follow AASHTO M288 for subsurface drainage applications. item code description; 729012 rock slope protection fabric (class 10) 729011 rock slope protection fabric (class 8) 723220 concreted-rock slope protection (1/4 t, class v, method b) (ton) Take care not to tear the filter fabric during installation. stream If necessary, order additional weep holes. Maximum slope 1.5:1 horiz:vert, (67% or 34) or flatter, and is limited to slopes < 30' of uninterrupted length. %PDF-1.3 % In 2007, the FAA approved construction of a new center field taxiway (Taxiway Mike) to alleviate airfield congestion. 2. The concreted-rock slope protection method is used where large rock is not economically available in large quantities, yet a heavy, service type of protection is required. The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed under Section 4-7203A, Rock Slope Protection, earlier in this section. If the rock contains an excess of fines or inadequate voids, the desired results may be impossible to obtain. Before construction of any type of slope protection, review the plans, Standard Specifications, special provisions, any pertinent preliminary test data, and the location of the installation. The maximum height of the vertica l lower portions 3.5 feet. Your search for great running gear starts and ends with us. IMPLEMENTATION OF ROCK SLOPE PROTECTION (RSP) DESIGN >> <>/Font<>>>/Fields[]>> The best slope protection type for a given situation depends on the conditions where the installation is to be made, availability of protection material, cost of the various types, and protection desired. Whether you're speeding down a slope or cycling uphill, the F5 can be worn in a number of ways to fit your training and needs. JavaScript is required to use content on this page. Obtain initial samples and have them tested for the specified attributes. Start by choosing whether your patio is a **single rectangle** or if it has a different shape, in which case you. 0000004014 00000 n Method B is not restrictive with respect to the placement of individual rocks. For measurement and payment, do the following: Chapter 1 - Caltrans Construction Organization, CalOES: Power Outage and Fire Recovery Resources. 0000008354 00000 n Erosion Control Blankets Wattles help slow water runoff and reduce soil erosion. . K@^9t% OZ$Mb Ne#^/_*Zw;*T_]k. 0000009975 00000 n Properly designed and planted vegetative covers play 0000012187 00000 n Please enable scripts and reload this page. 0000007052 00000 n The equilibrium soil-to-geotextile system that allows for adequate movement of a liquidin the plane of the geotextile over the service lifetime of the application. %PDF-1.4 % Use the size and composition of yarn that is recommended by the fabric manufacturer. - Shoreline Protection with EcoTubes&trade; CALTRANS does not have an APL/QPL for fabrics. Mirafi N-Series nonwovens combine high water flow rates, high soil interaction and durability while providing excellent soil particle retention. /Filter/FlateDecode Erosion control devices provide direct protection to the soil surface therefore, are considered one the best measures for preventing erosion. Copies of these details are made available below in both Adobe Portable Document Format (PDF) and AUTOCAD Drawing (DWG) file formats. Place a layer (six inch minimum) of AASHTO is typical mass of 4.1 sy/oz.. endobj All items. The method is particularly adaptable to locations where high-velocity flow is not detrimental, but desirable, and the hydraulic efficiency of smooth surfaces is important. 10 0 obj (a) Exception: US 250NW is 5 pounds short on "grab breaking load" for Sediment Filter Bags. Stable rock sizes and flow depths for riprap-lined channels having gradients between 2 percent and 40 percent may Mirafi 140N is a lightweight non woven geotextile that meets AASHTO M288 Class 3 geotextiles for separation and subsurface drainage. Concrete canvas (CC) has the potential to become a widely used slope protection material owing to advantages such as flexibility, fast construction with low labor costs, and quick strength development. /OP true If using geotextile fabric, place on the smoothed foundation, overlap the edges at least 12 inches and secure with anchor pins spaced every three feet along the overlap. Geofabrics offers a range of engineered slope, embankment and retaining wall solutions of use in transport infrastructure projects. The small-rock slope protection method consists of excavating and backfilling the footing trench, placing rock slope protection fabric as shown, and placing small rocks on the slope. Contact your local TenCate Geosynthetic representative for the proper use and specification of these products. California Department of Transportation 0000014231 00000 n Keep records up to date. Barrier Landscape Edging & Paver Edging 6'/8. A Shoreline Erosion Control project would likely require fabric in the 10oz to 16oz weight range. Geotextiles. /Length 5601 463 0 obj << /Linearized 1 /O 465 /H [ 928 1116 ] /L 999132 /E 15929 /N 109 /T 989753 >> endobj xref 463 26 0000000016 00000 n 3, METHOD B) (TON), STRUCTURE EXCAVATION (ROCK SLOPE PROTECTION) (ENGMET). The gabions are placed on filter fabric as detailed in the plans and specifications. Ensure existing shrubs and trees are protected so that they continue to anchor the surrounding soil. Need quick pricing on Erosion Control Fabric? For details about concrete production, review Section 4-90, Concrete, of this manual. Values shown are based on Table 873.3A dimensions and an assumed specific gravity of 2.65. Temp. Copyright Maryland.gov. 2, METHOD B) (CY) (ENGMET), ROCK SLOPE PROTECTION (NO. Where applicable, inspect the footing areas and foundations for evidence of instability or areas where hydrostatic pressures may develop. conforming to the requirements of 710-03 Vinyl Coated Steel Fence Fabric, Class A Wire Diameter, except color. The bid item list and plans will specify which type of slope protection is to be performed. This section provides guidelines for inspecting slope protection for work specified under Section 72, Slope Protection, of the Standard Specifications. The devices include ground covers and channel liners such as: 1. Broken-concrete slope protection consists of placing broken concrete from job site locations identified within the contract. 8 0 obj Without proper slope protection, a serious erosion problem known as "beaching" can develop on the upstream slope. (see Riprap Slope Protection Worksheet). On a cut slope, this could be due to . Rock mesh slope protection is a technique to control rockfalls . The gabion method consists of placing wire mesh box-shaped baskets filled onsite with hard, durable rocks. When shotcrete is to be used, review Section 4-53, Shotcrete, of this manual. For combination slope/bench systems in TYPE A soil and a trench depth of less than 8 feet, the steepest maximum allowable slope is 53 degrees from the horizontal. For measuring concrete or shotcrete, refer to Sections 4-90, Concrete, or 4-53, Shotcrete, of this manual. 0000002044 00000 n Polypropylene is stable within a pH range of 2 to 13. For details about concrete production, review Section 4-90, Concrete, of this manual. Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Replace the 1st paragraph of section 73-3.028 with: Rocks for concreted-rock slope protection must comply with the gradation shown in the following table: Concreted-Rock Gradation . GHnBc__'h1'u]SO0P+R&yGeJ$FP?cSp28 1}9AQ #T6Bc*)_vU"]T hY# Mirafi N-Series nonwoven polypropylene geotextiles are used for soil separation, drainage in Transportation, Building Site, and Water Infrastructure projects such as subsurface drainage, permanent erosion control and roadway separation applications. BMP040 "rock slope protection (no fabric)" as applicable. Copyright 2007 State of California, (You may enter part of the word or the whole phrase), 1.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 1.8 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 108" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 2.1 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 2.4 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 24" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 48" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 60" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 600 MM CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) (METRIC), 72" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 84" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), 96" CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (COBBLE, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, 150 LB, CLASS III, METHOD B) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD A) (TON), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), CONCRETED-ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), REMOVE ROCK AND DEBRIS FROM CULTIVATED AREA, ROCK EXCAVATION (CONTROLLED BLASTING) (ENGMET), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, CLASS VII, METHOD B) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD A) (TON), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/2 T, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, CLASS V, METHOD B) (TON), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (CY), ROCK SLOPE PROTECTION (1/4 T, METHOD B) (TON), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD A), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B), ROCK SLOPE PROTECTION (1T, CLASS VIII, METHOD B) (TON), ROCK SLOPE PROTECTION (1T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (1T, METHOD B) (ENGMET), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY), ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (TON), ROCK SLOPE PROTECTION (2T, CLASS IX, METHOD A), ROCK SLOPE PROTECTION (2T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (CY), ROCK SLOPE PROTECTION (3/8 T, CLASS VI, METHOD B) (TON), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (CY), ROCK SLOPE PROTECTION (300 LB, CLASS IV, METHOD B) (TON), ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A), ROCK SLOPE PROTECTION (4T, CLASS XI, METHOD A), ROCK SLOPE PROTECTION (4T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (CY), ROCK SLOPE PROTECTION (60 LB, CLASS II, METHOD B) (TON), ROCK SLOPE PROTECTION (8T, METHOD A) (ENGMET), ROCK SLOPE PROTECTION (FACING, METHOD B) (CY), ROCK SLOPE PROTECTION (FACING, METHOD B) (TON), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (CY), ROCK SLOPE PROTECTION (LIGHT, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. Applicability Rock Slope Armor is applicable to: Slopes where unanticipated flows are encountered. There are three material gra requirements based on required rock layer dation thicknesses. Decide whether modifications are necessary as a result of changed conditions. When slope paving with concrete pavers is specified, ensure the special provision requirements are met. @>|0fWp^,Y/T!*gprE."8hjjJ7kUfmYxTsX"CfU2TL]Gdb_Kg,GA/`U)H!hkJARD[R` Ensure concrete is cured by one of the specified methods. YOU MUST NOTIFY US FABRICS BEFORE RECEIVING PRICING. Review Section 4-90, Concrete, of this manual for details about concrete production. endobj 1, METHOD B) (TON), ROCK SLOPE PROTECTION (NO. Mirafi 1100N, 1120N and 1160N are heavy weight nonwoven geotextiles for more severe or extremely harsh conditions, such as rip-rap and revetment applications. They are designed to protect against raveling-type rockfall that involves small-volume slope failures (up to about 7.6 m3 or 10 yd3) or blocks up to 1.5 m (5 ft), depending on the strength of the mesh used (Muhunthan et al. Intermittent inspection of placement of slope protection, slope paving, and fabric operations. Enter the item description of the code you wish to search for: Natural Resources & Energy Infrastructure, Energy - Power Generation - Renewables - Solar, Energy - Power Generation - Renewables - Wind. "QamV(Z3VL> The Maryland General Assemblys Office of Legislative Audits operates a toll-free fraud hotline to receive allegations of fraud and/or abuse of State government resources. HToL[U?Ayb:V;%Y48{RMLIlq&+J[mNN?J;A? endobj Method A is used where the stability of the rock slope protection is considerably dependent on the manner in which the individual rocks are placed. NTPEP Datamine Information: RG80NC is a tracking model number for the following manufacturers products: Mirafi 180NC, SKAPS GE180/GT180C or Propex 861. % It consists of a layer of very large stones interlocked together and acts as a barrier on slopes that are unstable because of seepage problems or in areas that are receiving a large concentrated flow. > The State of Maryland pledges to provide constituents, businesses, customers, and stakeholders with friendly and courteous, timely and responsive, accurate and consistent, accessible and convenient, and truthful and transparent services. (800) 518-2290, Providing the most comprehensive geosynthetic lines in the industry. For Type R, F, or Common stone riprap, provide Type 2 filter fabric when shown on the plans. construction contract standards page. When changes are made, maintain records of details, depths, heights, and other dimensions, and enter these on the as-built plans. Roll size is 15'x300 Equivalent to Mirafi 1120NC or Skaps GT112 (Click here for spec) endobj PsVPvCHWTxml4N,P>{Ur]JBV:V,iVkNm(C d3@p/J3O//.cji-+TA3 dsU)~Ds:mp7=h&X#0C]\:k`#+VW^`0 0=F5VvL(^f State-furnished materials and expenses, as well as supplemental work items and descriptions. Ensure that the contractor performs concrete finishing as specified and that the slope paving is cured by one of the specified methods. C-15 Permeable rock jetties (fish habitat structures) C-8 C-16 Close-up of permeable rock jetty C-8 C-17 RSP tied to solid rock outcrop, natural impermeable retard (jetty) C-9 C-18 Soil-filled voids, natural vegetation C-9 C-19 Channel cut through deposited beach sand C-10 C-20 Layers of deposited sand C-10 5 0 obj Mirafi 160N is a lightweight nonwoven geotextile that meet AASHTO M288 Class 2 geotextiles for separation and subsurface drainage. 0000012468 00000 n Flat or needle shaped rock must not be used unless the individual rock thickness is greater than 0.33 times the length. When evidence exists that the foundation depth is inadequate, obtain both the design and hydraulics engineers concurrence with a change order to deepen the foundation. uuid:bc193511-b4f2-4d99-b47d-5ec173dc2f21 When slope protection is paid by weight, refer to the discussion of weighing and metering procedures in Section 3-902E, Weighing Equipment and Procedures, of this manual. Rock Channel Protection Paved Gutter 601.13 Basis of Payment 601.01 Description. (You may enter part of the word or the whole phrase). At the terminals of protection, ensure the contractor is particularly careful to avoid erosion and undercutting. You may check the size of rock by roughly measuring the size and converting the volume to mass. 0000002336 00000 n The heavier fabrics provide more strength and are less likely to tear when large class II or Class III boulders are placed on them. Caltrans requires the use of these new RSP gradations starting August 1st, 2016 in new projects and those not yet at 30 percent PS&E stage. Rock Slope Armor is a layer of rock, such as ditch lining rock, cobble rock, concrete rubble, or riprap, which is hand or mechanically placed on an erodible soil slope. For RSP Classes I thru VIII, use Class 8 RSP-fabric which has lower weight per unit area and it also has lower toughness (tensile x elongation, both at break) than Class 10 RSP-fabric. are available to meet BABA (Build America, Buy America) requirements. There are three material gradation requirements based on required rock layer thicknesses. Contact Us The method for placing rock will either be Method A or Method B, whichever the contract designates, as discussed in Section 4-7203A, Rock Slope Protection, of this manual. endobj If your 20'x10' patio is to have a 6" base, then you should excavate a total area of 21' (20' +6" +6") by 11' (10' +6" +6"). You can also lay bags of sand along problem areas in your landscape to keep soil from washing away and to redirect water. At the start of gabion placement, require the contractor to verify the minimum unit weight of the gabions to ensure it meets specifications. Rock Slope Protection practice is intended for slopes too unstable for revegetation practices alone. 1 0000004037 00000 n RG12N Nonwoven Geotextile with a 300 lbs grab tensile strength and a flow rate of 65 gallons a minute per square foot. Geotextiles have been in use for thousands of years dating back to the Egyptian Pharaohs. Properly designed slope protection and stabilization has to include two components: a vegetational-biological and a mechanical-structural component. endstream The finish surface must be roughened by brushing to expose rocks.